News
Goldseebahn NEW from Dez. 2021
News from the ski area
The new skilift Goldseebahn will be completed in Dezember 2021 and is also open in summer 2022.
The new Goldseebahn
Chairlift furniture:
6-seater chairlift: The technical description is„6-CLD-B“ (6: number of persons, CLD: chairlift detachalbe; B: bubble) – detachable 6-seater charilift with Bubbles.
- seat heating
- protective casing
- child-proof lock for every seat
- autmatic seat-bail
- summer operation bike transport with Bike Clip at the chairlift
Facts Goldseebahn:
- valley station 2.070m
- mountain station 2.240m
- 6-seater chairlift
- 5,5m/sec max speed
- 3,1 minutes run time
- 41 chairlifts
- 2400 p/h capacity
- 9 pillars
from dezember 2021
Goldseebahn
Construction-cam valley station Goldseebahn
Construction progress valley station Goldseebahn